Settled floors, or even entire buildings, can be lifted back into place with our two-component polymer foams from the AP LIFT series, which are designed for both wet and dry conditions. The expansion force of SPETEC® foam, combined with the pressure of a specialised pump, creates enough controlled force to lift practically any structure back to its original position with 2 mm precision. SIA Antislip Baltics has experienced specialists and all the equipment and tools needed for high-quality geotechnical work. We also have access to patented, specialised and unique solutions from the Belgian company SPETEC, which has more than 30 years of experience in developing and applying such materials.
Important
Our experience, and that of every company representing the SPETEC brand, shows that a settled floor or building is very often fixed simply by lifting the structure back to its original level, which is relatively simple and inexpensive. Before levelling floors or buildings (lifting them back to their original position), it is important to analyse why they settled; otherwise the problem may return within a few months or years. Deeper soil layers may well need to be compacted before the structure is levelled, a process we call Deep Lift®.
Brochure: lifting floors and foundations
Lifting floors and foundations (PDF, in Latvian)How is the work usually organised and carried out?
-
To assess the conditions and prepare the most accurate cost estimate possible, our specialists will visit the site. This service is FREE OF CHARGE.
-
After a visual inspection of the site, a DCP test is often needed: soil density measurements at different depths. This test helps pinpoint the cause of the problem and whether Deep Lift® processes may be needed. This service is also free of charge, but the test results remain with us for drawing up an accurate work plan and costs.
-
Within a few days the client receives a cost estimate, and all questions about the work are clarified.
In most cases, lifting a floor or foundation takes no more than one working day.
-
For precise and lasting floor levelling, the client should expect holes to be drilled in the floor (2–4 per m²). After the injections, they are sealed with a suitable repair material.
To lift building foundations, the injections are made from outside the building
The lifting process is always monitored with high-precision instruments.
-
No further work is needed after the floor or building has been levelled (lifted back to its original position)
How to buy? What does it cost? Free samples:
Weekdays 8:00–17:00